Reef Central Online Community

Go Back   Reef Central Online Community > Blogs > slow_leak
Blogs FAQ Calendar

Notices

Rate this Entry

Next Step - Upgrade for Future Power Failures

Posted 10/06/2009 at 07:43 AM by slow_leak

While the simple upgrade of splitting circuit load may help, I still would like to know basic tank parameters and electrical power status if I am gone away to call for help or get home ASAP.

APEX controller can inform you by text messages but only if back up power to PC is working. I'll try to

Will be the next step in long term success. The best way I can see to give 24 hrs of reserved energy is with the Tunze Stream Two. Two car batteries in parallel will provide 12 volts for up to 20 hours to the Tunze 6105. This should be more than adequate to maintain aeration. Maintaining batteries will require an automated trickle charger or solar panel trickle charger as well.
Posted in Uncategorized
Views 26745 Comments 0 Edit Tags Email Blog Entry
« Prev     Main     Next »
Total Comments 0

Comments

 

All times are GMT -6. The time now is 03:15 PM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2024, Jelsoft Enterprises Ltd.
Powered by Searchlight © 2024 Axivo Inc.
Use of this web site is subject to the terms and conditions described in the user agreement.
Reef CentralTM Reef Central, LLC. Copyright ©1999-2022
User Alert System provided by Advanced User Tagging v3.3.0 (Pro) - vBulletin Mods & Addons Copyright © 2024 DragonByte Technologies Ltd.