|
06/01/2008, 05:31 PM | #1 |
Premium Member
Join Date: Mar 2005
Location: california
Posts: 182
|
Manifold?
Working on my main return Manifold and wondering were the dump valve for excess pressure should be. Before the return and equipment or after. IE. DUMP, RTNS, CHILLER, FUGE, CA REACTOR, ECT>>>
Or, EQUIPMENT then DUMP? Using a Reeflow Goby or Baracuda, so i will have more than enough flow and whant to be able to throtle the flow without to much back pressure on the pump.. |
06/01/2008, 07:23 PM | #2 |
Registered Member
Join Date: Jun 2006
Location: Pasadena, Texas
Posts: 8,422
|
Chris from Reeflo came to our reef club meeting and said those pumps could be throttled with no affect on the pump. If you're still concerned, put the dump at the end.
__________________
Click on my red house to see my 390 and 300 build thread. Those are my last 2 tanks in Tampa. Now in Pasadena waiting to buy a house to set up my next tank....anemones and clowns...probably a 3x3 150 gallon. |
06/01/2008, 07:57 PM | #3 |
Premium Member
Join Date: Mar 2005
Location: california
Posts: 182
|
Thanks....
|
Thread Tools | |
|
|