Reef Central Online Community

Go Back   Reef Central Online Community > General Interest Forums > Lighting, Filtration & Other Equipment
Blogs FAQ Calendar

Notices

User Tag List

Reply
Thread Tools
Unread 01/03/2010, 09:15 AM   #1
royvoss
Registered Member
 
Join Date: Sep 2007
Location: nj
Posts: 467
basement plumbing,

high,

i have had my tank set up for almost three years, dt up stairs and sump/skimmer ect down in the basement. have always had a lot of air coming through the drain pipe. also kind of nosiy. so i decided to vent the pipe dumping in the sump. shortly after i started the pump up water would pour out the vent. need to put the vent up high to keep it form over flowing cured it. the amount of air entering the sump is greatly reduced. now i have alot of noise from the overflow/durso box. venting the pipe increased the flow rate through the drain pipe and is now causing the over flow so sound like a continous flushing noise. the one way i can see to fix it is to restrick the main drain. ? is this the best way, or is there a nother way. wife does not like the noise.(ear plugs did not make her happy). any help would be greatfull.

roy


royvoss is offline   Reply With Quote
Reply


Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is On



All times are GMT -6. The time now is 01:51 AM.


Powered by vBulletin® Version 3.8.4
Copyright ©2000 - 2025, Jelsoft Enterprises Ltd.
Powered by Searchlight © 2025 Axivo Inc.
Use of this web site is subject to the terms and conditions described in the user agreement.
Reef CentralTM Reef Central, LLC. Copyright ©1999-2022
User Alert System provided by Advanced User Tagging v3.3.0 (Pro) - vBulletin Mods & Addons Copyright © 2025 DragonByte Technologies Ltd.