![]() |
![]() |
![]() |
#1 |
Registered Member
Join Date: Dec 2004
Location: Jacksonville, FL
Posts: 466
|
Locline w/Reeflo Dart
Hey all, I am in the process of finishing up the building of my 120G and am getting near the plumbing part of it. I have a Dart on a CL in my 75G now and am moving it over to the 120 and drilling this time (need to design this still). The biggest loclines I see are 3/4", isn't that a bit to small?? Wouldn't that kill the flow?? Here is a pic of what I did on the 75, dont want to do it that way again...
![]()
__________________
Philip Jacksonville, FL 120G with 40G Sump Current Tank Info: 120G AGA RR |
![]() |
![]() |
![]() |
#2 |
Registered Member
Join Date: Sep 2003
Location: Cary, NC
Posts: 449
|
I'm can't answer this question, but I'm interested to hear the response. I also just setup a CL using a Dart and split the 1.5" outlet into 3 3/4" lines. 2 are connected to the overflow returns drilled in the tank, and the 3rd is connected to a SCWD.
I have ever had it configured any other way so I have no means of comparison, but am interested to see what others say. |
![]() |
![]() |
![]() |
|
|